Project Implementation Process
1. Understand customer needs and tailor system solutions and wiring diagrams based on the hotel's positioning, decoration design, and other practical factors.
2. Communicate with the hotel and designers to determine system functions, equipment, and quotations in detail.
3. Sign the contract.
4. Modify the wiring diagrams to become actual construction drawings.
5. Construction personnel conduct preliminary buried pipeline work according to the drawings and install RCU boxes.
6. Install the RCU host and various switch panels according to the decoration progress, and complete the equipment wiring.
7. Line calibration.
8. Single-room debugging. After confirming that the lines are correct, perform power-on debugging.
9. Networking and software debugging. Ensure the physical connection of the network lines is correct and the network equipment is working properly. Perform networking and software debugging.
10. After the system is completed, provide training to relevant hotel personnel and provide complete system instructions and related drawings for filing.
11. After-sales service.